Who builds this
We ate these problems before we built for them.
Ten-plus years in field construction operations before a line of this was written — pouring, coordinating trades, chasing RFIs that should have been answered three weeks earlier. We didn’t research these problems. We were the ones eating them.
- Field construction operations, on site
- 10+ yrs
- Documented builds, numbers published
- 3
- Code packs — Canada, the US, England
- 8
6–8h recovered every weekCase 01
Mid-size residential / ICI GC. Blueprint review before sub meetings went from 4–6 hours to under one.
−41% RFI turnaroundCase 02
9.2 days down to 5.4, measured across a full project cycle.
+24% win rate in 60 daysCase 03
Measured across the first sixty days of tendering.
Three engagements, not a controlled study: each figure is one firm’s own measurement of its own projects, reported to us, and no fourth case is being left out. The firms asked not to be named, which limits what the numbers can tell you, so treat them as three data points and get your own. That is what the free trial and the ROI calculator are for.
Built for your role: